| 1. | GAMA INDUSTRIAL PLANTS MANUFACTURING AND INSTALLATION CO. |
Fabrication and Erection Works for the Penstocks,
Suction Pipe, Second Phase Embedded Parts, İnlet Screens, Stay Ring,
Radial and Service Gates, Spiral Case of 6x175 MW Birecik Dam- Hydro
Electric Power Plant (HEPP)
Birecik/URFA |
01.10.1996 |
Works on progress |
| 2. | ÖZKAR CONSTRUCTION CO. |
Disassembling of the 2x150 m3/hr Capacity Concrete Batching Plant at Birecik Dam Site and Transporting to Çine Dam and Reerection Works at Çine Dam Site by Revising and Extending and the Conveyor System. AYDIN |
19.10.1999 |
Works on progress |
| 3. |
Rehabilitation of Converter Gas Cooling System SAMSUN |
18.12.1998 | 09.09.1999 | |
| 4. | ÇANKIRI WEAPON INDUSTRY CORP. |
Manufacturing and Heat Treatment of Cannon
Gunstocks
ÇANKIRI |
16.05.1996 | 31.12.1996 |
| 5. |
Local Manufacturing and Complete Erection of Birecik Dam 2 Tower Batching Plant Birecik/URFA |
01.07.1996 | 28.04.1997 | |
| 6. |
Turn-key Supply and Erection of a Rail Bound, Self Propelled, Ship Unloader, PLC System Hopa/ARTVİN |
23.12.1993 |
09.02.1996 |
|
| 7. | GENERAL ELECTRIC AIRCRAFT ENGINES CO. | Radiographic
Inspection of F-100 and F-110 Aircraft Engines
ANKARA |
30.07.1992 | 31.03.1993 |
| 8. | ÇUKUROVA MACHINERY PRODUCTION & TRADE CO. | Design
and Manufacture of a Hydromechanical 8 Positioner
ADANA |
01.06.1992 | 30.09.1992 |
| 9. | ÇUKUROVA MACHINERY PRODUCTION & TRADE CO. | Design
and Manufacture of a Shot Blasting Machine
ADANA |
01.02.1991 | 30.06.1991 |
| 10. | ÇUKUROVA MACHINERY PRODUCTION & TRADE CO. | Design
and Manufacture of a Hydromechanical 8 Positioner
ADANA |
20.03.1991 | 30.09.1991 |
| 11. | ISISAN HEAT INDUSTRY CO.INC | Ercetion
of the Heat Treatment Furnace
KAYSERİ |
25.04.1991 | 25.06.1991 |
| 12. | EKONTUR FOREIGN TRADE CO.INC. | Design
and Manufacturing of a Hot Oil Tank
İSKENDERUN |
01.08.1988 | 30.09.1988 |
| 13. |
EJVA CONSORTIUM ESCHER WYSS - BBC) |
Erection of a Turbine at Ataturk Dam- Hydro Electric Power Plant (HEPP) URFA |
30.03.1987 |
30.09.1987 |
| 14. | MKEK ELMADAĞ GUNPOWDER FACTORY |
Erection of the Stainless Stell Piping
System
ANKARA |
15.05.1988 | 30.09.1988 |
| 15. | BLACKSEA COPPER WORKS CORP. |
Manufacturing of Two No's of Heat Exchangers
SAMSUN |
14.08.1986 | 14.08.1987 |
| 16. | SWEMCO |
Manufacture and Lining of Acid Scrubbers
SAMSUN |
22.05.1986 | 22.01.1987 |
| 17. |
Erection of 2 Container Handling Cranes İZMİR |
14.11.1985 |
03.07.1986 |
|
| 18. |
POSTS TELEPHONE TELEGRAM DIRECTORATE ( PTT) |
Installation of Underground Cable Ducts . ANKARA |
10.09.1987 |
31.08.1988 |
| 19. | BLACKSEA COPPER WORKS CORP. |
Design and Manuafcturing of Waste Heat
Boiler
GÖKTAŞ |
27.02.1985 | 01.07.1985 |
| 20. | MUNICIPALITY OF SAMSUN |
Design and Fabrication of 3 Asphalt Tanks
SAMSUN |
17.09.1985 | 20.01.1986 |
| 21. | BLACKSEA COPPER WORKS CORP. |
Rehabilitation of the Concentrator
Murgul/ ÇAKMAKKAYA |
01.02.1984
|
31.12.1985 |