1. GAMA INDUSTRIAL PLANTS MANUFACTURING AND INSTALLATION CO.

Fabrication and Erection Works for the Penstocks, Suction Pipe, Second Phase Embedded Parts, İnlet Screens, Stay Ring, Radial and Service Gates, Spiral Case of 6x175 MW Birecik Dam- Hydro Electric Power Plant (HEPP)

Birecik/URFA

01.10.1996

 Works on progress

2.

ÖZKAR CONSTRUCTION CO.

Disassembling of the 2x150 m3/hr Capacity Concrete Batching Plant at Birecik Dam Site and Transporting to Çine Dam and Reerection Works at Çine Dam Site by Revising and Extending and the Conveyor System.

AYDIN

19.10.1999

Works on progress

3.

GENERAL DIRECTORATE OF BLACKSEA COPPER PRODUCTION  

Rehabilitation of Converter Gas Cooling System     

SAMSUN

18.12.1998 09.09.1999
4. ÇANKIRI WEAPON INDUSTRY CORP. Manufacturing and Heat Treatment of Cannon Gunstocks

ÇANKIRI

16.05.1996 31.12.1996
5.

HÖLTER Industrie Technik

Local Manufacturing and Complete Erection of Birecik Dam 2 Tower Batching Plant

Birecik/URFA

01.07.1996 28.04.1997
6.

TURKISH GRAIN BOARD

Turn-key Supply and Erection of a Rail Bound, Self Propelled,  Ship Unloader, PLC System

Hopa/ARTVİN

23.12.1993

09.02.1996

7. GENERAL ELECTRIC AIRCRAFT ENGINES CO. Radiographic Inspection of F-100 and F-110 Aircraft Engines

ANKARA

30.07.1992 31.03.1993
8. ÇUKUROVA MACHINERY PRODUCTION & TRADE CO. Design and Manufacture of a Hydromechanical 8 Positioner

ADANA

01.06.1992 30.09.1992
9. ÇUKUROVA MACHINERY PRODUCTION & TRADE CO. Design and Manufacture of a Shot Blasting Machine

ADANA

01.02.1991 30.06.1991
10. ÇUKUROVA MACHINERY PRODUCTION & TRADE CO. Design and Manufacture of a Hydromechanical 8 Positioner

ADANA

20.03.1991 30.09.1991
11. ISISAN HEAT INDUSTRY CO.INC Ercetion of the Heat Treatment Furnace

KAYSERİ

25.04.1991 25.06.1991
12. EKONTUR FOREIGN TRADE CO.INC. Design and Manufacturing of a Hot Oil Tank

İSKENDERUN

01.08.1988 30.09.1988
13.

EJVA CONSORTIUM

ESCHER WYSS -  BBC)

Erection of a Turbine at Ataturk Dam- Hydro Electric Power Plant (HEPP)

URFA

30.03.1987

30.09.1987

14. MKEK ELMADAĞ GUNPOWDER FACTORY Erection of the Stainless Stell Piping System 

ANKARA

15.05.1988 30.09.1988
15. BLACKSEA COPPER WORKS CORP. Manufacturing of Two No's of Heat Exchangers

SAMSUN

14.08.1986 14.08.1987
16. SWEMCO Manufacture and Lining of Acid Scrubbers

SAMSUN

22.05.1986 22.01.1987
17.

SALZGITTER- KOCKS -ASMAŞ CONSORTIUM 

Erection of 2  Container Handling Cranes

İZMİR

14.11.1985

03.07.1986

18.

POSTS TELEPHONE TELEGRAM DIRECTORATE        ( PTT)

Installation of Underground Cable Ducts .

ANKARA

10.09.1987

31.08.1988

19. BLACKSEA COPPER WORKS CORP. Design and Manuafcturing of Waste Heat Boiler

GÖKTAŞ

27.02.1985 01.07.1985
20. MUNICIPALITY OF SAMSUN Design and Fabrication of 3 Asphalt Tanks

SAMSUN

17.09.1985 20.01.1986
21. BLACKSEA COPPER WORKS CORP. Rehabilitation of the Concentrator

Murgul/ ÇAKMAKKAYA

01.02.1984

 

31.12.1985

PROJECTS